Western Lithium Resource Estimate Stage I Lens Mineral Resources

Kings Valley Stage I (PDC) Indicated Mineral Resources - Interim Update

Cutoff Li % Million Metric Tonnes Li % LCE Contained Metric Tonnes
0.20 179 0.29 2,765,400
0.25 120 0.32 2,044,400
0.30 70 0.35 1,307,200
0.35 30 0.39 628,300
0.40 10 0.43 230,500
0.45 2 0.47 62,400

Kings Valley Stage I Inferred Mineral Resources - Interim Update

Cutoff Li % Million Metric Tonnes Li % LCE Contained Metric Tonnes
0.20 172 0.29 2,687,700
0.25 118 0.32 2,036,700
0.30 77 0.35 1,436,700
0.35 33 0.39 686,400
0.40 10 0.42 231,000
0.45 0.3 0.47 7,700

*Inferred tonnes one drill hole within 225x300m with at least 3 composites used in the estimation; Indicated tonnes minimum 2 drill holes within 150x200m with at least 4 composites used in the estimation.
Contained metal does not allow for mine and metallurgical recovery. 1.8 tonnes/m3 tonnage factor used.
Reasonable prospects of economic extraction by open pit mining established using: $3.00 Lithium Carbonate USD/lb, 92% metallurgical recovery, $69 USD/tonne processing, $2.35 USD/tonne Mining;
Rounding errors may exist

Kings Valley Stage II (South) Indicated Mineral Resources

Cutoff Li (%) Million Metric Tonnes Li (%) Contained LCE Metric Tonnes
0.15 127 0.25 1,690,000
0.20 95 0.27 1,365,000
0.25 50 0.31 825,000
0.30 27 0.34 489,000

Kings Valley Stage II (South) Inferred Mineral Resources

Cutoff Li (%) Million Metric Tonnes Li (%) Contained LCE Metric Tonnes
0.15 74 0.23 906,000
0.20 47 0.26 650,000
0.25 20 0.30 319,000
0.30 9 0.34 163,000

* Inferred tonnes within 213 meters of nearest drill hole with at least 3 composites used in the estimation; indicated tonnes two drill holes within 143 meters with at least 6 composites used in the estimation.

Contained metal does not allow for mine and metallurgical recovery.
1.96 tonnes/m3 tonnage factor used.
Economic assumptions for cutoff grade are the same as for the Stage I (PCD) Lens PAEE: $3.50 lithium carbonate/lb, 60% metallurgical recovery.
$50/tonne processing, $2.20 USD/tonne mining.
Rounding errors may exist.