Western Lithium Resource Estimate Stage I (PCD) Lens Mineral Resources

Kings Valley Stage I (PDC) Indicated Mineral Resources

Cutoff Li % Million Metric Tonnes Li % LCE Contained Metric Tonnes
0.175 60 0.253 803,000
0.200 48 0.269 688,000
0.225 36 0.288 548,000
0.250 26 0.308 423,000
0.275 18 0.327 318,000
0.300 12 0.346 229,000

Kings Valley Stage I (PCD) Inferred Mineral Resources

Cutoff Li % Million Metric Tonnes Li % LCE Contained Metric Tonnes
0.175 54 0.252 723,000
0.200 42 0.269 606,000
0.225 30 0.291 471,000
0.250 21 0.317 353,000
0.275 16 0.334 282,000
0.300 10 0.358 197,000

*Inferred tons within 700 ft. of nearest drill hole, Indicated tons 2 drill holes within 660 ft., 1 within 470 ft.;
Contained metal does not allow for mine and metallurgical recovery; 17.8 ft3/ton tonnage factor used;
Economic assumptions for base-case cutoff grade (high-lighted), $3.50 Lithium Carbonate USD/lb, 60% metallurgical recovery,
$45 USD/ton processing, $2 USD/ton Mining;
Rounding errors may exist

Kings Valley Stage II (South) Indicated Mineral Resources

Cutoff Li (%) Million Metric Tonnes Li (%) Contained LCE Metric Tonnes
0.15 127 0.25 1,690,000
0.20 95 0.27 1,365,000
0.25 50 0.31 825,000
0.30 27 0.34 489,000

Kings Valley Stage II (South) Inferred Mineral Resources

Cutoff Li (%) Million Metric Tonnes Li (%) Contained LCE Metric Tonnes
0.15 74 0.23 906,000
0.20 47 0.26 650,000
0.25 20 0.30 319,000
0.30 9 0.34 163,000

* Inferred tonnes within 213 meters of nearest drill hole with at least 3 composites used in the estimation; indicated tonnes two drill holes within 143 meters with at least 6 composites used in the estimation.

Contained metal does not allow for mine and metallurgical recovery.
1.96 tonnes/m3 tonnage factor used.
Economic assumptions for cutoff grade are the same as for the Stage I (PCD) Lens PAEE: $3.50 lithium carbonate/lb, 60% metallurgical recovery.
$50/tonne processing, $2.20 USD/tonne mining.
Rounding errors may exist.